Toshiba SUZUMI + RAS-B22N3KV2-E1SUZUMI + RAS-B24N3KV2-E1 Manuel utilisateur

PDF
Document
Toshiba SUZUMI + RAS-B22N3KV2-E1SUZUMI + RAS-B24N3KV2-E1 Manuel utilisateur | Fixfr
/

User questions

D K

Linda D.

How to manage condensation during device installation?

Insulate the two connection pipes separately using 8 mm thick polyethylene foam. Ensure the drain pipe is sloped downwards, without kinks, and that the end is not submerged in water. Do not place any components, such as power cords, higher than the unit's drainage guide.

D K

Linda D.

What are the requirements for managing condensation and drainage during installation?

To prevent malfunctions, both connection pipes must be insulated separately with 8 mm polyethylene foam. The drainage pipe must be installed with a downward slope, without waves, and the end must not be submerged. Ensure the power cord is not positioned higher than the drainage guide.

D K

Linda D.

How to manage condensation and drainage during installation?

Insulate connection pipes separately with 8mm thick polyethylene foam. The drainage pipe must be installed with a downward slope, without bends or waves, and the outlet must not be submerged. Ensure the drain guide is positioned correctly to prevent leaks.

Preparing document for printing…
0%